Pavement Management

The Pavement Management System is a tool to inventory the physical road network, determine pavement conditions, and develop a method for prioritizing pavement restoration. The Engineering Division developed this system and maintains the pavement condition data on an annual basis.

Paving Moratorium Streets

Streets Paved in Past 5 Years

In accordance with the Town of Burlington  “Street Opening/Utility Connection Rules and Regulations", no street opening permits shall be issued on newly  constructed/paved roads for a period of five years after the roadway is constructed or paved.

Related Documents