MWRA

Phase 1:

The project to connect Burlington's water supply to the Massachusetts Water Resources Authority (MWRA) is well underway. Phase 1 is designed to supply one million gallons (MGD) of water per day to the Town of Burlington via the Town of Lexington. These pictures (below) show the final connection of the MWRA Phase 1 project to Burlington's Water System.

Phase 2:

The MWRA Phase 2 project which will extend from Burlington to Arlington is in the design phase and construction is expected to start in 2021.